What is Slowing Down Your PCB Prototyping Production?

When it comes to releasing new technology, time is of the essence. New technology needs PCBs, and slowdowns will delay its release. In business, time is money, so delivering PCBs on time is vitally important.

Stated by a PCB manufacturer, if your PCB prototyping production time isn’t meeting the deadlines, then it’s time to look at what might be slowing you down. PCB production does not have to take long, as turnkey production has shown. A traditional PCB manufacturer might not be able to deliver at that speed, but there are steps you can take to improve efficiency.

Too Many Parties Involved

Prototyping is one of the lengthiest steps in assembly. Consider how long it can take to design, produce, and ship prototypes, especially when dealing with facilities all over the world. You can speed up your production by doing all your prototyping within your facility.

If your prototype does not work, then the process often has to be repeated. Each little fix requires the prototype sent to the designers, then to the production house, and then to the testing facility. Instead, these steps can be completed in one place.

Delays in Supply Shipping

Another common reason why prototyping is slow is that you don’t have the necessary supplies on hand. When you have to order supplies for each project, shipping issues will slow you down, especially if your supplies are sourced overseas. You did not only slow your production, but you also add tariffs into the mix.

Since you cannot control shipping, tariffs, or other supply-chain issues, you can avoid prototyping slowdowns by taking control of the accessories and supplies you have on hand. By sourcing supplies yourself and doing it ahead of time, you should be able to get better prices, especially if you do not need to pay for expedited shipping costs.

Outdated Technology

Some PCB manufacturers have outdated machinery. When your machinery is slow, prototyping slows down too. Some manufacturers are turning to CNC milling to speed their prototyping. With the correct programming, a CNC mill can make a prototype in a few hours, and larger models might take a little longer. Granted, it will not be as precise as the finished product. But, isn’t that what a prototype is?

Along with machinery, take a good look at your technology. If you haven’t upgraded your computers or software in several years, you may not be compatible with newer tech or with your clients. The age of your tech should seriously slow you down.

Incomplete Documentation Files

Some manufacturers have issues with prototypes because the collection of files is incomplete. Each PCB requires a package of documents with drill files, lists of materials, CAD files, Gerber files, and instructions and drawings. Without the complete list, the prototype will have missing pieces.

When manufacturers have to fill in the missing pieces, prototype production slows. Therefore, it is important that each project is highly organized, and the files needed for the project need to be accessible for everyone who works on it. This could be an issue with organization, communication, or delivery, and could be fixed by developing an organizational file structure that is stored in the cloud.

Contributed by Chris Dickey, vice president of sales and marketing at SVTronics