Lots of studies find that most of the cost (75%-plus) of an electronics product is determined in the design phase.
Here’s my question: Do those studies take the BoM costs into account as part of the design cost? Or are all the “costs” in this sense value-added (design, fab, assembly, rework, etc.)?